What is the maximum wind speed at which crane operations for pole erection should typically be suspended?

  1. 10 mph
  2. 15 mph
  3. 20 mph
  4. Determined by the crane manufacturer's load chart and site-specific conditions

Answer: D — Determined by the crane manufacturer's load chart and site-specific conditions