What is the correct method for compacting backfill material in a conduit trench?
- Dump all material at once and drive heavy equipment over it
- Place backfill in lifts of 6 to 12 inches and compact each lift to specified density
- Leave the backfill loose without compaction
- Use only water to settle the backfill
Answer: B — Place backfill in lifts of 6 to 12 inches and compact each lift to specified density