What document typically shows the phasing and timing plan for a new traffic signal installation?

  1. The foundation plan sheet
  2. The signal timing sheet included in the construction plans
  3. The grading plan
  4. The landscaping plan

Answer: B — The signal timing sheet included in the construction plans

The correct answer is shown above. Try the full quiz for additional practice.