What type of work zone typically requires the most extensive TTC setup?

  1. Utility pothole repair taking 15 minutes
  2. Lane closure on a high-speed, high-volume freeway lasting several months
  3. Mailbox repair on a residential street
  4. Mowing operations along a rural road shoulder

Answer: B — Lane closure on a high-speed, high-volume freeway lasting several months