Practice question
What is the primary operational objective of a Standard Instrument Departure (SID) route?
- To provide a safe transition from the take-off phase to the en-route phase, while ensuring obstacle clearance and noise abatement.
- To separate VFR traffic from arriving IFR traffic in uncontrolled airspace.
- To allow the aircraft to land automatically under Cat III meteorological conditions.
- To permit aircraft to fly at high speed below 10,000 feet in terminal areas.
Answer: A — To provide a safe transition from the take-off phase to the en-route phase, while ensuring obstacle clearance and noise abatement.
The correct answer is shown above. Try the full quiz for additional practice.
Practice more: KCAA ATC Practice Questions - KCAA Air Traffic Controller Theoretical Knowledge Examination (Kenya) Exam →