Practice question
Why must prestressed concrete piles be picked at the designated lift points shown on the shop drawings?
- Lift points are only for painting and have no structural meaning
- Picking at the designed points keeps bending stresses within the pile's handling capacity and prevents cracking
- Prestressed piles cannot crack, so any pickup location is acceptable
- Lift points are used only when the pile will be jetted, not when it will be driven
Answer: B — Picking at the designed points keeps bending stresses within the pile's handling capacity and prevents cracking