Practice question

Why must newly placed concrete pavement be cured?

  1. To keep enough moisture and a favorable temperature in the slab so hydration can continue and plastic-shrinkage cracking is reduced
  2. To stain the surface so inspectors can see the pour
  3. To eliminate the need for any joints
  4. To lower the 28-day strength on purpose

Answer: A — To keep enough moisture and a favorable temperature in the slab so hydration can continue and plastic-shrinkage cracking is reduced