Before initiating the driving sequence, the leads holding the hammer and pile should be:
- Leaning at least 10 degrees off vertical
- Plumb (within close tolerance) so driving energy is delivered concentrically along the pile axis
- Resting against the tracks
- Disconnected from the rig
Answer: B — Plumb (within close tolerance) so driving energy is delivered concentrically along the pile axis