Before raising the leads during setup, the operator should FIRST confirm that:

  1. The machine is level and on adequate supporting ground, with overhead clearance verified
  2. The radio is set to the loudest volume
  3. The hammer is painted
  4. Lunch break is scheduled

Answer: A — The machine is level and on adequate supporting ground, with overhead clearance verified