Before raising the leads during setup, the operator should FIRST confirm that:
- The machine is level and on adequate supporting ground, with overhead clearance verified
- The radio is set to the loudest volume
- The hammer is painted
- Lunch break is scheduled
Answer: A — The machine is level and on adequate supporting ground, with overhead clearance verified