Practice question

Upon completing pile driving for the day, the FIRST step in disassembly and securing is generally to:

  1. Immediately load the rig on a trailer with the leads up
  2. Stow or store the hammer safely and lower/secure the leads per the manufacturer's instructions before transport
  3. Leave the hammer suspended at full height overnight
  4. Remove the operator's manual permanently

Answer: B — Stow or store the hammer safely and lower/secure the leads per the manufacturer's instructions before transport

The correct answer is shown above. Try the full quiz for additional practice.