When the hammer is stowed or stored at the end of operations, it should be:

  1. Left hanging from a single worn rope
  2. Lowered onto stable support or secured in its stowed position so it cannot fall or shift
  3. Balanced loosely on top of a staged pile
  4. Placed on the energized power line

Answer: B — Lowered onto stable support or secured in its stowed position so it cannot fall or shift