Which of the following is the correct sequence concept when finishing work with a dedicated pile driving rig?
- Transport first, then stow the hammer and lower the leads
- Stow/secure the hammer and lower/retract the leads, then secure components, then transport within legal limits
- Leave everything in the driving position and drive home
- Remove the counterweight before lowering the leads
Answer: B — Stow/secure the hammer and lower/retract the leads, then secure components, then transport within legal limits
The correct answer is shown above. Try the full quiz for additional practice.