From which portion of a ready-mix truck discharge should a field sample normally be taken for slump, air, and strength testing?

  1. The very first concrete out of the truck
  2. The very last concrete out of the truck
  3. The middle portion of the discharge after some material has been wasted
  4. The wash water from the drum

Answer: C — The middle portion of the discharge after some material has been wasted

The correct answer is shown above. Try the full quiz for additional practice.