Practice question

Why should an inspector avoid directing the contractor's means and methods except for immediate safety or contract compliance concerns?

  1. Because inspectors must always run the crew
  2. Because the contractor is responsible for means and methods while the inspector verifies compliance and results
  3. Because directions are given only by surveyors
  4. Because it avoids all documentation

Answer: B — Because the contractor is responsible for means and methods while the inspector verifies compliance and results