Practice question

Which record best supports payment for a measured underdrain installation item?

  1. A rough verbal estimate from the end of the shift
  2. A diary entry or quantity book showing measured installed length and limits
  3. The supplier's invoice alone
  4. The subcontractor's memory of how much was placed

Answer: B — A diary entry or quantity book showing measured installed length and limits

The correct answer is shown above. Try the full quiz for additional practice.

Practice more: NICET HCI Practice Questions - NICET Highway Construction Inspection Exam →