Practice question

A utility conflict is found in the field, and the contractor asks to move the work based on a verbal suggestion from a utility representative. What should the inspector do?

  1. Approve the field change verbally to avoid delay
  2. Document the conflict and obtain authorized written direction before the changed work is concealed
  3. Tell the contractor to do whatever is quickest and explain later
  4. Ignore the conflict if the revised location looks workable

Answer: B — Document the conflict and obtain authorized written direction before the changed work is concealed

The correct answer is shown above. Try the full quiz for additional practice.