Practice question
To keep sediment from being tracked onto a public highway, EPA construction BMPs and NMDOT Section 603 expect the Contractor to provide:
- A silt fence across the travel lane
- A stabilized construction exit (typically a rock tracking pad) at the point vehicles leave the disturbed site
- A fog seal on the haul road clay
- Only a sweeper after the project is complete
Answer: B — A stabilized construction exit (typically a rock tracking pad) at the point vehicles leave the disturbed site
The correct answer is shown above. Try the full quiz for additional practice.