Per NMDOT 2019 618.2.3, when Work is not in progress the traffic control supervisor shall be available by telephone to be on the Project within:
Answer: D — One hour
The correct answer is shown above. Try the full quiz for additional practice.
The correct answer is shown above. Try the full quiz for additional practice.