Practice question

Per NMDOT 2019 618.2.2, Contractor-requested revisions to the traffic-control Plan shall be submitted in which format?

  1. A text message to the inspector with no drawing
  2. A marked-up restaurant napkin scanned at any size
  3. Verbal direction only, with no submittal
  4. CAD format, or hand-drafted on a 12 inch × 18 inch sheet of 20-pound paper using current drafting standards

Answer: D — CAD format, or hand-drafted on a 12 inch × 18 inch sheet of 20-pound paper using current drafting standards