Per NMDOT 2019 618.2.2, complex traffic-control Plans require development by whom before submittal to the Project Manager?

  1. A registered professional Engineer
  2. Any certified flagger
  3. The sign-shop foreman only
  4. The truck driver delivering the drums

Answer: A — A registered professional Engineer

The correct answer is shown above. Try the full quiz for additional practice.