Practice question
At a railway level crossing, when may the 50 m approach speed be up to 50 km/h instead of 30 km/h?
- When a flashing white light is operating on the crossing equipment
- When the driver is late
- When the crossing has no signs
- When the vehicle has four-wheel drive
Answer: A — When a flashing white light is operating on the crossing equipment
The correct answer is shown above. Try the full quiz for additional practice.
Practice more: Slovakia Theory Test B Practice Questions - Slovakia Category B Driving Licence Theory Test Exam →