Practice question

Which concrete pavement joint is sawed or formed at a regular spacing to control random cracking from shrinkage?

  1. Construction joint only
  2. Contraction (control) joint
  3. Isolation joint used only at a bridge approach
  4. Longitudinal lane-tie joint only

Answer: B — Contraction (control) joint