Falsework under a cast-in-place concrete bridge span is:

  1. The permanent railing system
  2. Temporary support that carries the wet concrete and forms until the span can support itself
  3. A type of driven pile left in the finished structure as the only girder
  4. The waterproofing membrane on the deck

Answer: B — Temporary support that carries the wet concrete and forms until the span can support itself