Practice question

The usual safe sequence for mechanical demolition of a multi-story structure is:

  1. Remove the foundation first so the building drops as a unit
  2. Work from the top down, taking upper floors before undermining supporting members below
  3. Cut all columns on the first floor simultaneously with no engineering controls
  4. Start in the center of the lowest floor and work outward

Answer: B — Work from the top down, taking upper floors before undermining supporting members below

The correct answer is shown above. Try the full quiz for additional practice.