Practice question

Which statement is correct about product, valve route, fittings, and transfer equipment should be verified before connecting hoses?

  1. Transfer equipment does not need verification.
  2. Product, valve route, fittings, and transfer equipment should be verified before connecting hoses.
  3. Small leaks should be ignored until delivery.
  4. Grounding and bonding increase tank capacity.

Answer: B — Product, valve route, fittings, and transfer equipment should be verified before connecting hoses.

The correct answer is shown above. Try the full quiz for additional practice.

Practice more: Washington CDL Tanker Endorsement Test Practice Questions - Washington CDL Tanker Vehicles Endorsement Test Exam →