Practice question

A bus A/C system is being evacuated. The purpose of the vacuum (evacuation) step is to:

  1. Remove air and boil off moisture before recharging
  2. Test compressor clutch operation
  3. Pressurize the system for a leak test
  4. Add refrigerant oil to the system

Answer: A — Remove air and boil off moisture before recharging

The correct answer is shown above. Try the full quiz for additional practice.

Practice more: ASE S7 Air Conditioning Systems & Controls (School Bus) Practice Questions - ASE S7 - Air Conditioning Systems & Controls (School Bus) Certification Exam →