Practice question
What is the primary objective of implementing a 'Zipper Merge' (Late Dynamic Merge) system in heavy traffic work zones?
- To encourage drivers to use both lanes up to the merge point and alternate turns.
- To force drivers to merge into a single lane 2 miles before the taper.
- To restrict heavy commercial trucks from using left travel lanes.
- To eliminate all advance warning signs in urban construction corridors during work.
Answer: A — To encourage drivers to use both lanes up to the merge point and alternate turns.
The correct answer is shown above. Try the full quiz for additional practice.
Practice more: C-31 Traffic Control Practice Questions - California CSLB C-31 Construction Zone Traffic Control Examination Exam →