Practice question
What is the final step a traffic control supervisor must perform before opening a newly installed temporary traffic control zone to live traffic?
- Collect all spare sandbags and store them inside the buffer space.
- Disassemble the advance warning signs to prepare for quick teardown.
- Turn off all arrow boards and PCMS displays to conserve battery power before leaving the site overnight.
- Drive through the entire setup at prevailing traffic speed to inspect visibility and alignment.
Answer: D — Drive through the entire setup at prevailing traffic speed to inspect visibility and alignment.