Practice question
When preparing a bid for a public works highway striping contract, how should a C-32 contractor account for the quantity of glass retroreflective beads?
- Calculate glass beads as 1.0 pound per gallon of waterborne paint.
- Calculate glass beads as 3.0 pounds per gallon of waterborne paint.
- Calculate glass beads as 4.5 pounds per gallon of waterborne paint.
- Calculate glass beads as 6.0 pounds per gallon of waterborne paint.
Answer: D — Calculate glass beads as 6.0 pounds per gallon of waterborne paint.
The correct answer is shown above. Try the full quiz for additional practice.