What document must a C-32 contractor submit to verify that traffic paint or thermoplastic material meets California VOC and environmental regulations?
- The manufacturer's Safety Data Sheet (SDS) and Technical Data Sheet (TDS).
- A notarized copy of the contractor's current state contractor license certificate.
- The municipal building inspector's personal sign-off signature card.
- A written guarantee of zero paint wear for a period of ten years.
Answer: A — The manufacturer's Safety Data Sheet (SDS) and Technical Data Sheet (TDS).