When striping an Electric Vehicle (EV) charging stall in California, what pavement color scheme and symbol are commonly required by local green building codes?

  1. Red stall background with a yellow gas pump stencil icon.
  2. Black stall background with a red warning triangle stencil.
  3. Green border or background with a white EV charging cord stencil.
  4. Orange border with a blue International Symbol of Accessibility icon overlay.

Answer: C — Green border or background with a white EV charging cord stencil.

The correct answer is shown above. Try the full quiz for additional practice.