Practice question
When striping an Electric Vehicle (EV) charging stall in California, what pavement color scheme and symbol are commonly required by local green building codes?
- Red stall background with a yellow gas pump stencil icon.
- Black stall background with a red warning triangle stencil.
- Green border or background with a white EV charging cord stencil.
- Orange border with a blue International Symbol of Accessibility icon overlay.
Answer: C — Green border or background with a white EV charging cord stencil.
The correct answer is shown above. Try the full quiz for additional practice.