Under the GCOR, when two trains meet at a siding and one must take the siding, which train typically has the right-of-way to stay on the main track?
- The train traveling in the eastbound direction always has priority
- The superior train as defined by the timetable (class, direction, and schedule number)
- The train with the heaviest tonnage always has priority
- The first train to reach the siding switch takes the siding
Answer: B — The superior train as defined by the timetable (class, direction, and schedule number)
The correct answer is shown above. Try the full quiz for additional practice.