MS Highway Practice Questions - Mississippi Highway Contractor Examination Exam
Practice mode
Question
1
of 25
QUESTION 1 / 25
Using a common dense-graded hot-mix asphalt (HMA) unit weight of 145 lb/ft³, about how many tons are in one compacted cubic yard?
Choose one answer below.
A
1.0 ton
✓
B
1.5 tons
✓
C
2.0 tons
✓
D
2.5 tons
✓
QUESTION 2 / 25
How many square yards of pavement surface are in one 12-foot-wide lane that is 1 mile long?
Choose one answer below.
A
1,760 SY
✓
B
5,280 SY
✓
C
7,040 SY
✓
D
63,360 SY
✓
QUESTION 3 / 25
A 12-foot lane, 1 mile long, will receive 2 inches of compacted HMA. Using 110 lb per square yard per inch of thickness, how many tons are required (neat line, no waste)?
Choose one answer below.
A
387 tons
✓
B
774 tons
✓
C
1,548 tons
✓
D
3,520 tons
✓
QUESTION 4 / 25
What is the primary purpose of a tack coat before placing a new HMA lift on an existing asphalt or concrete surface?
Choose one answer below.
A
To waterproof the embankment subgrade
✓
B
To bond the new lift to the existing surface so the layers act together
✓
C
To replace rolling and density control on the new mat
✓
D
To cool the existing pavement before the paver arrives
✓
QUESTION 5 / 25
On an MDOT-type highway job, when is a prime coat used instead of a tack coat?
Choose one answer below.
A
On a clean, existing asphalt or concrete pavement immediately before an overlay
✓
B
On an untreated aggregate base or granular surface to bind fines and promote bond of the first asphalt course
✓
C
On the finished HMA surface as a substitute for a fog seal after traffic is on the road
✓
D
Only on airport runways, never on public highways
✓
QUESTION 6 / 25
For dense-graded HMA, what is the usual minimum compacted lift thickness relative to the mix's nominal maximum aggregate size (NMAS)?
Choose one answer below.
A
Equal to the NMAS
✓
B
At least twice the NMAS
✓
C
At least three times the NMAS
✓
D
At least ten times the NMAS
✓
QUESTION 7 / 25
For most dense-graded HMA mixes, when should breakdown and intermediate rolling generally be finished relative to mat temperature?
Choose one answer below.
A
After the mat has cooled below 100°F so the rollers will not leave marks
✓
B
While the mat is still hot and workable, typically before it cools to about 175°F
✓
C
Only after a 24-hour cure, the same as Portland cement concrete
✓
D
Only when the plant mixing temperature exceeds 400°F
✓
QUESTION 8 / 25
In a conventional HMA rolling train, what is the usual sequence of roller functions?
Choose one answer below.
A
Finish roller, then breakdown roller, then pneumatic intermediate roller
✓
B
Breakdown roller immediately behind the paver, then intermediate roller, then finish roller
✓
C
Only a pneumatic roller, because steel wheels are not used on HMA
✓
D
Vibratory rolling only after the mat has cooled below 150°F
✓
QUESTION 9 / 25
When paving the hot lane against a previously placed cold HMA lane, how should the longitudinal joint generally be constructed and compacted?
Choose one answer below.
A
Leave a 6-inch open gap so rainwater can drain through the joint
✓
B
Overlap the cold edge slightly, match the joint, and compact from the hot side so the joint is pinched and densified
✓
C
Always roll only from the cold lane so the new mix is not displaced
✓
D
Omit tack at the joint face so the two lanes can move independently
✓
QUESTION 10 / 25
How should a transverse (header) joint in HMA generally be prepared before the next paving pull?
Choose one answer below.
A
Leave the feathered overnight edge in place and pave over it without cutting
✓
B
Cut back to a full-depth, near-vertical face, tack the face, and match grade before rolling across the joint
✓
C
Flood the joint with water so the new mix will cool faster
✓
D
Place a paper bond-breaker so the new mat never touches the old mat
✓
QUESTION 11 / 25
What is aggregate segregation in an HMA mat, and where does it most often start?
Choose one answer below.
A
A uniform rich film of binder over the entire surface, usually from too much tack
✓
B
Separation of coarse and fine particles, often beginning at truck loading, truck exchange, or the paver hopper wings
✓
C
Air voids that are too low because the breakdown roller made too many passes
✓
D
A laboratory-only problem that cannot appear in the finished roadway
✓
QUESTION 12 / 25
On an HMA paving job, what is a nuclear density gauge primarily used to check?
Choose one answer below.
A
The asphalt binder performance grade at the refinery
✓
B
In-place density (and often moisture) of the compacted mat for process control
✓
C
The exact truck payload to the nearest pound
✓
D
The slump of the hot mix, the same as for concrete
✓
QUESTION 13 / 25
After rolling, what in-place air-void range does the Hot-Mix Asphalt Paving Handbook generally associate with a properly compacted dense-graded mat?
Choose one answer below.
A
0% to 1%, because any void is a defect
✓
B
About 6% to 8%
✓
C
15% to 20%, the same as an open-graded friction course
✓
D
25% to 30%, to guarantee drainage through the wearing course
✓
QUESTION 14 / 25
Why do many highway and airfield HMA specifications require or encourage a material transfer vehicle (MTV) between the truck and the paver?
Choose one answer below.
A
To heat the existing pavement to 400°F before the overlay
✓
B
To remix the HMA and reduce thermal and aggregate segregation delivered to the paver
✓
C
To replace the need for breakdown rolling
✓
D
To apply tack coat automatically at 1.0 gallon per square yard
✓
QUESTION 15 / 25
What is the main function of the paver screed?
Choose one answer below.
A
To mill the existing pavement to grade
✓
B
To strike off the HMA to the target thickness and provide initial leveling and compaction
✓
C
To apply the prime coat to the subgrade
✓
D
To measure nuclear density of the finished mat
✓
QUESTION 16 / 25
Why does cold, windy weather make HMA compaction more difficult on a thin lift?
Choose one answer below.
A
The mix stays above 300°F longer, so rollers have too much time
✓
B
The mat loses heat faster, shortening the time the mix is still compactable
✓
C
Asphalt hydrates more slowly in the cold, like concrete
✓
D
Tack coat freezes into a structural slab that replaces the HMA
✓
QUESTION 17 / 25
What is the principal reason for cold-milling an existing asphalt pavement before an overlay?
Choose one answer below.
A
To heat the old pavement so tack is unnecessary
✓
B
To remove distressed material and restore profile, cross slope, and a uniform overlay thickness
✓
C
To increase the old pavement's air voids before the new lift is placed
✓
D
To convert the project from HMA to Portland cement concrete without changing thickness
✓
QUESTION 18 / 25
Immediately before placing an HMA overlay, what surface condition is required?
Choose one answer below.
A
The surface should be dirty and damp so the tack will emulsify on contact
✓
B
The surface should be clean, reasonably dry, and uniformly tacked after brooming or sweeping
✓
C
The surface should be flooded so the paver tracks will not pick up mix
✓
D
The surface should be salted to keep the new mat from bonding too well
✓
QUESTION 19 / 25
A truck arrives with HMA that has cooled well below the job-mix placement range. What is the most likely field result if that load is placed anyway?
Choose one answer below.
A
The mat will be easier to compact because the binder is stiffer
✓
B
The crew will not be able to reach specified density, and the surface may tear or remain open
✓
C
The mix will hydrate and gain strength overnight like concrete
✓
D
Air voids will automatically fall to zero without rolling
✓
QUESTION 20 / 25
What is the characteristic compaction action of a pneumatic (rubber-tired) roller on HMA compared with a steel-wheel roller?
Choose one answer below.
A
It only cuts the longitudinal joint and cannot be used on the main mat
✓
B
It kneads the mix, which helps density and seals surface voids, while a steel-wheel roller provides a smoother finished surface
✓
C
It is the only roller allowed after the mat cools below 175°F because it vibrates the stone matrix
✓
D
It is used only to apply tack coat by driving through the emulsion
✓
QUESTION 21 / 25
A crew places 400 tons of HMA on 3,200 SY. Using 110 lb/SY/inch, what compacted thickness was actually placed?
Choose one answer below.
A
1.50 inches
✓
B
2.00 inches
✓
C
2.27 inches
✓
D
3.00 inches
✓
QUESTION 22 / 25
A 12-foot travel lane is designed with a 2% cross slope. What is the elevation difference from centerline to edge of pavement?
Choose one answer below.
A
0.12 inches
✓
B
0.24 inches
✓
C
1.44 inches
✓
D
2.88 inches
✓
QUESTION 23 / 25
In a hot-mix asphalt mixture, what is the primary role of the asphalt binder?
Choose one answer below.
A
To replace the coarse aggregate so the mix can be placed without stone
✓
B
To coat and bind the aggregate particles into a durable, waterproof mass
✓
C
To entrain 20% air so the mix will drain like an open-graded base
✓
D
To make nuclear density gauges unnecessary
✓
QUESTION 24 / 25
A Superpave binder is graded PG 64-22. What do the two numbers mean?
Choose one answer below.
A
64% binder and 22% air voids in the job-mix formula
✓
B
The binder is intended to perform up to an average 7-day maximum pavement temperature of 64°C and down to a minimum pavement temperature of −22°C
✓
C
The mix must be produced at 64°F and compacted at 22°F
✓
D
The binder penetration is 64 at 22°F
✓
QUESTION 25 / 25
How does stone-matrix asphalt (SMA) differ from a conventional dense-graded HMA wearing course?
Choose one answer below.
A
SMA has almost no coarse aggregate and relies on sand only
✓
B
SMA is a gap-graded, stone-on-stone mix with a rich mortar (often with fiber) for rut resistance and durability
✓
C
SMA is a cold emulsion mix that is never compacted
✓
D
SMA is used only as a prime coat on aggregate base
✓